-
Steel Structure 4S Store
This integrated steel structure 4s store complex provides a turnkey structural platform merging premium vehicle showrooms, heavy-duty service bays, and parts warehousing under one high-performance
-
Steel Frame Office Building
This pre-engineered steel frame office building engineered with high-strength Q355B (ASTM A572 Grade 50) structural columns offers a rapid-assembly solution for modern multi-story corporate
-
Auto 4S Shop Steel Frame
Build your premium dealership with ZSL’s 60m+ clear-span auto 4s shop steel frame. Engineered with high-strength Q355B Steel (Yield ≥ 355MPa) and compliant with ASCE 7-22 wind load standards
-
Large-span Stadium Steel Frame
ZSL's large-span stadium steel frame uses a welded H-section portal frame system to deliver 30m to 60m clear spans — enough for a full-size basketball court, 8 badminton courts, or a community
-
High-rise Office Steel Structure
Precision-engineered high-rise office steel structure using Q355B high-tensile steel. Designed for Seismic Zone 8+ and wind loads up to 42m/s. Prefabricated components reduce on-site construction
-
Prefab Steel Retail Building
Constructed with Q355B high-tensile steel, ZSL’s retail buildings offer a 40m clear span to eliminate internal load-bearing columns. All components are CNC-fabricated with ±2mm precision and treated
-
Prefab Steel Supermarket
Utilizing a Q355B high-tensile skeleton, ZSL supermarkets achieve a 40m clear span, eliminating internal columns to maximize retail floor ROI. Precision-engineered via CNC (±2mm) and protected by a
-
Commercial Steel Supermarket
This high-performance commercial steel supermarket system, engineered with Q355B (ASTM A572 Grade 50) structural steel, provides an obstruction-free 40m+ clear span to maximize retail floor ROI and
-
Steel Structure Shopping Mall
Engineered with high-tensile Q355B (ASTM A572 Grade 50) steel, ZSL’s steel structure shopping mall systems deliver vast, column-free atriums with 40m+ clear spans, maximizing tenant floor ROI and
-
Modular Steel Store
A modular steel store isn't a building—it's a business asset that starts generating revenue the day it opens. ZSL delivers pre-engineered retail structures with 24m clear spans—no internal columns
-
Modular Steel Warehouse
Engineered for the high-velocity logistics era, ZSL’s modular steel warehouse systems utilize high-tensile Q355B (ASTM A572 Grade 50) steel to deliver unrivaled structural agility. With a unique
-
Steel Structure Warehouse Construction
Construction is a promise of future performance. At ZSL, we don’t just deliver steel; we deliver operational readiness. From the high-heat deserts of Saudi Arabia to the moisture-heavy landscapes of
Steel structure construction is not affected by season, it can construct in rainy season, here we introduce the precautions in construction. Skip to content Call...
Sep 06, 2021 · Steel framed structure construction starts with the construction of its foundation. Usually, the designs of the foundation required for the given structure are based on the bearing...
May 24, 2022 · The lightweight and simple structures are widely used in large factories, stadiums, super high-rise buildings, and other fields. Steel Structure Building Construction provides...
Fig. 1: Conventional Steel Fabrication 2. Bolted Steel Construction In this technique, all structural steel members are fabricated and painted off-site,...
Steel Structure Erection Procedure Phase 1: Anchor Bolt Setting Step 1: Marking for boundary line of starting column on footing Step 2: Check and adjust position of starting column-rebar if...
The building industry is searching in the next type of product to use to improve the building structure and reduce costs of the building performance. Structural Steel. The construction of...


